Hospitality & LeisureCase studyOngoing

Hilton Garden Inn, Al Hofuf

A five-star flag in our home city of Al Hofuf: full civil works and every building service, engineered and delivered under one programme, on site now.

ClientConfidential hospitality group
LocationAl Hofuf, Saudi Arabia
Scale62,000 m²
Programme34 months
StatusOn site
ScopeCivil Works · HVAC · Electrical · Plumbing · Fire Protection
Hilton Garden Inn, Al HofufAl Hofuf, Saudi Arabia
5★Operator standard
LOD 400Coordination model
34Months on programme
01

The brief

International hotel operators audit buildings the way aviation authorities audit aircraft. Every system (chilled water, domestic hot water, kitchen extract, life safety) has a brand standard behind it, and handover fails on the detail, not the headline.

The client wanted the structure, the architecture, and all of the building services carried by the same engineers, so that a coordination problem could never become a contractual one.

02

The build

Carrying civil and MEP together changes the sequence. Our BIM team froze the services model before the first slab was poured, so every sleeve, riser, and builder's opening was cast in, not cut in afterwards. On a hotel, where ceilings are low and shafts are money, that discipline is worth entire floors of headroom.

The guestroom floors run on a repeating MEP module: prefabricated bathroom service walls, plug-and-play fan coil connections, and corridor services dressed on racks assembled at ground level. Each typical floor closes out in eleven days.

03

Where it stands

The project is on site now, tracking the operator's staged inspection regime. Podium plant rooms are set, risers are climbing with the structure, and the first mock-up guestroom has passed brand review, the milestone that locks the design for the hundreds of rooms that follow.

What made this one different

The engineering worth reading twice

Cast-in coordination01

Cast-in coordination, zero re-drilling

Because our engineers set out the slab and hang the duct, we froze a fully clash-resolved LOD 400 model early and cast every penetration into the structure. The drill-and-fix trade that normally follows the structure up the tower simply does not exist on this job.

The payoff is programme and honesty: no patched cores, no fire-stopping surprises, and a structure that looks the way its as-builts say it does.

  • LOD 400 federated model
  • 100% cast-in penetrations
  • 11-day typical floor cycle
  • Prefabricated bathroom service walls
Hilton Garden Inn, Al Hofuf
Hilton Garden Inn, Al Hofuf
Hilton Garden Inn, Al Hofuf
Hilton Garden Inn, Al Hofuf
Hilton Garden Inn, Al Hofuf
Hilton Garden Inn, Al Hofuf
Hilton Garden Inn, Al Hofuf
Hilton Garden Inn, Al Hofuf

“Freeze the services model before the first pour, and the drill-and-fix trade never has to exist.”

, Project Director, Green Square
Hyperbaric Oxygen Therapy Suite, HMC

Next case study

Hyperbaric Oxygen Therapy Suite, HMC

Doha, Qatar

Facing a similar problem?

We like the projects other contractors turn down. Tell us what you are trying to build.

Talk to an engineer