All case studies
District coolingRetail
Connecting a mall to district cooling
Integrating 120,000 square metres of retail with a district cooling network without a single day of lost trading.
120KSquare metres of retail
0Days of lost trading
24/7Cooling continuity
Connecting a live retail destination to a district cooling network is open-heart surgery: the mall cannot close, the tenants cannot lose cooling, and the changeover has to be invisible to shoppers.
This case study is being written up. The full story, including the phasing plan and the changeover night itself, will be published here soon.
Facing a similar problem?
We like the projects other contractors turn down. Tell us what you are trying to build.
Talk to an engineer